Institut universitaire de cardiologie et de pneumologie de Québec - Québec
Adapting and finding novel ways to deliver despite organizational and technical hurdles
Habitat was hired to build a new floor on the existing clinical research pavilion, to enable the Institute to expand its services. This project posed a huge technical challenge for Habitat as we had to work around the research centre’s operations. We had to orchestrate each construction stage so as to cause as little disturbance (noise and vibrations) as possible to the researchers on the ground floor working in animal research. This was a challenging project, but another great success for Habitat.
1 / 4
2 / 4
3 / 4
4 / 4